What Are the 8 Types of Waste in Lean Management? (2024)

Businesses have a surprising amount of waste. We’re not talking about garbage. We’re talking wasted time, effort, space, resources—anything that doesn’t add value for your clients.

Waste is often broken down into eight categories, sometimes called “the 8 wastes of lean operations.” Identifying and reducing waste can reduce your company’s costs, lead times and accidents and make employees and customers happier.

“Any activity that doesn’t add value to your customers or to your company can potentially be considered waste,” says Anish Ambujakshan, an expert on operational efficiency and a Senior Business Advisor with BDC Advisory Services. “People usually get used to doing things the same way over the years. They often forget to pause, challenge the status quo and look for opportunities for improvement.”

What is waste?

The first step to eliminating waste is to understand what it is.

Waste is inefficiency that directly and negatively impacts your business, operations, customers, profit and growth.

“Let’s say there is redundant or incorrect data entry that happens during your customer order fulfilment,” Ambujakshan says. “Each error is a non-value-added activity and is a waste. Reducing that not only improves productivity, but also improves your employee morale. Identifying waste is eye-opening and also a steppingstone to operational improvements.”

Ambujakshan breaks down waste into the following eight categories. (Note that there is no standardized list of categories of waste. Some lists use different categories or have a different number of wastes, such as the “7 wastes of lean.”)

The 8 wastes

1. Overproduction

Producing more or sooner than needed.

How to spot it: Accumulation of material or work in progress found near workstations.

Consequences: Higher costs for storage and labour to move and manage material; hindrance to workspace flow, clutter.

Possible solution: Proper planning of production to meet your customer demand.

2. Waiting

Idle workers or machines.

How to spot it: Employees are waiting for instructions, tools or material to complete tasks. Machines aren’t used to full capacity or at all.

Consequences: Costs resulting from lower productivity of employees or machines; opportunity costs are incurred due to underutilized production potential.

Possible solution: Improve communication with better work instructions and better capacity planning.

3. Inefficient operations

Operations that aren’t efficient or necessary and don’t add value for the customer.

How to spot it: Products are overprocessed (i.e. made to higher specifications than customers need). Excess scrap material accumulates at workstations.

Consequences: Higher production and material costs.

Possible solution: Establish production standards.

4. Transport

Excess movement of materials, products or information.

How to spot it: Items being moved more than needed, often criss-crossing paths and hindering other movement in the facility.

Consequences: Longer lead times, increased transportation costs.

Possible solution: Reorganize workspaces or processes to reduce transport and optimize flow.

5. Inventory

More inventory than needed, excessive handling of inventory items.

How to spot it: Examine inventory turnover data, physically review inventory.

Consequences: Higher costs for inventory storage space, management and maintenance; possible spoilage and other losses.

Possible solution: Review your inventory management.

6. Motion

Unnecessary movement of people or activities.

How to spot it: Employees spend excess time getting, moving or searching for tools, material or information. Excess injuries, errors, accidents and production delays.

Consequences: Longer lead times, higher production costs, lost time to injuries, lower production quality.

Possible solution: Improve workspace layout or production processes.

7. Poor quality

Poorly made or designed products or services.

How to spot it: Employees use incorrect processes; scrap material accumulates due to rework; high rates of defects, rework, returns and customer complaints.

Consequences: Lost sales; damaged brand; delivery delays; longer lead time; higher costs for labour, material and equipment to rework products.

Possible solution: Improve quality control, processes, standards, machine maintenance, training and work instructions.

8. Misused resources

Underutilized or mismatched employee skillsets.

How to spot it: Compare skillsets and assigned responsibilities; check performance evaluations for issues.

Consequences: Employees not performing to expectations, poor engagement, opportunity cost of underused skills.

Possible solution: Review employee responsibilities to better use talent; consider training to ensure employees can perform to the best of their abilities.

How do you identify waste?

A crucial way to spot waste is physically walking through the plant or office to observe how work is done. Efficiency experts calls this a Gemba walk.

The method was pioneered by the Toyota Motor Corp., which is renowned for its trailblazing efficiency methods.

Gemba means “the real place” in Japanese. The idea is to see in person the place where value is created—how work is actually done, not what it says in policy manuals or what managers think is happening.

“The most critical element for identifying waste is seeing the operations,” Ambujakshan says. “You need to be inquisitive during a Gemba walk. Be curious to understand the workflow and the rationale behind each process step. Observe and ask questions. The way actual work is completed could be different from the way managers think it is done.”

3 tips for a successful Gemba walk

1. Go see, ask why, analyze

The Gemba walk is a time to observe and respectfully ask employees why processes and tasks are carried out in a certain way. It’s not the time to blame or evaluate employees or work on solutions.

The two principles are to (1) go see and (2) ask why. Be inquisitive, ask questions and have a collaborative mindset.

After the Gemba walk, it’s time for the third step: analyze. Meet your team to discuss your observations and identify underlying causes of problems and solutions, using tools such as root cause analysis, fishbone diagrams and Pareto analysis.

Three steps to a succesful Gemba walk

2. Use a checklist

Use a checklist to mark down observations about the eight types of waste. Afterward, teams can add action items to fix issues. Such meetings are also an opportunity to discuss progress on earlier action items.

3. Use technology

Observations can be recorded on paper, but using a cellphone or tablet can make the process more efficient and useful. A digital checklist, for instance, can be more easily shared with your team. A device can also be used to record video or take photos of issues that warrant discussion and action.

4. Do Gemba walks regularly

Ambujakshan recommends a 15- to 20-minute Gemba walk every day, though this can vary by facility size. As efficiency issues are corrected, frequency and duration can decrease. “Doing Gemba walks needs to be one of the key responsibilities of any supervisor,” Ambujakshan says. “It should be a lifestyle that reinforces a culture of continuous improvement.”

Read our free guide to learn more about the basics of operational efficiency or fill out a form to start talking with one of our experts and unlock your business’s full potential.

What Are the 8 Types of Waste in Lean Management? (2024)

FAQs

What are the 8 types of waste in lean? ›

To help focus efforts in this area, Lean practitioners developed a list of eight wastes which establish the most likely areas where waste will occur: defects, overproduction, transportation, non-value adding processing, motion, waiting, unused talent and inventory.

What is the acronym for the 8 wastes of lean? ›

TIMWOODS is an acronym that stands for Transportation, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects, and Skills. These are the 8 wastes of Lean. TIMWOODS drives efficiencies in business processes by identifying and eliminating these wastes.

What are the 8 wastes or Muda in lean terms? ›

7 Lean wastes initially, 8th Muda added later

These seven mudas include overproduction, waiting, transportation, overprocessing, excessive inventory, unnecessary movement, and defect production. It was later that the eighth form of muda, the non-use of talents, was added.

Who invented the 8 wastes of lean? ›

Originally there were seven wastes identified by Taiichi Ohno for the Toyota Production System. As lean evolved into the rest of the enterprise and around the world, an eighth waste, non-utilized talent, was identified.

How do you identify 8 wastes? ›

The 8 wastes of lean manufacturing include:
  1. Defects. Defects impact time, money, resources and customer satisfaction. ...
  2. Excess Processing. Excess processing is a sign of a poorly designed process. ...
  3. Overproduction. ...
  4. Waiting. ...
  5. Inventory. ...
  6. Transportation. ...
  7. Motion. ...
  8. Non-Utilized Talent.

What is muda mura Muri? ›

Muda (waste), Mura (inconsistency), and Muri (overburden) are the three categories that significantly impact workflow, productivity, and customer satisfaction. The three concepts were created by Taiichi Ohno and are crucial to the Lean Principle which uses strategies from Muda, Mura, and Muri.

What are 7 wastes in Lean? ›

The seven types of waste result in the acronym TIMWOOD (Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects), which can still be found in older guidebooks.

What is muda in Lean? ›

Muda in lean management is any activity that doesn't add value to the business. This Japanese word translates to “wasteful” in English, the opposite of value-added work and productivity. It's a best practice in manufacturing to reduce and eliminate wastefulness in order to improve efficiency and increase profitability.

What does 5S stand for? ›

The 5S pillars, Sort (Seiri), Set in Order (Seiton), Shine (Seiso), Standardize (Seiketsu), and Sustain (sh*tsuke), provide a methodology for organizing, cleaning, developing, and sustaining a productive work environment.

What is kaizen in lean? ›

Lean production is founded on the idea of kaizen – or continual improvement. This philosophy implies that small, incremental changes routinely applied and sustained over a long period result in significant improvements.

Why is waste called muda? ›

Muda (無駄, on'yomi reading, ateji) is a Japanese word meaning "futility", "uselessness", or "wastefulness", and is a key concept in lean process thinking such as in the Toyota Production System (TPS), denoting one of three types of deviation from optimal allocation of resources.

What is an example of mura? ›

Mura is a type of waste caused by unevenness in production and services. It is also caused when standards are nonexistent or are not followed. One common example is when companies ramp up production to meet targets, even when there is no customer demand.

What is 8 wastes of lean? ›

Defects, Over/Under Production, Waiting, Not Utilizing Talent, Transportation, Inventory, Motion, and Extra Processing.

What does the T stand for in the 8 wastes? ›

The 8th waste added is non-used employee talent (T), so that the 8 wastes can be easily remembered via the mnemonic “DOWNTIME” (Defective Production,Overproduction, Waiting, Non-used Employee Talent (the 8th form), Transportation, Inventory, Motion, and Excessive (Over) Processing)

What does gemba mean? ›

Gemba is Japanese for 'site' or 'scene', which is the place where the action is happening.

What are the 7 types of waste from the lean perspective? ›

The seven types of waste result in the acronym TIMWOOD (Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects), which can still be found in older guidebooks.

What are the 7 types of waste in Timwood? ›

Developed by the Lean manufacturing experts at Toyota, TIMWOOD is an acronym for the seven (7) wastes found in manufacturing: Transportation, Inventory, Motion, Waiting, Overproduction, Overprocessing, and Defects.

What are the 8 types of waste Wikipedia? ›

The types listed here are not necessarily exclusive and there may be considerable overlap so that one waste entity may fall into one to many types.
  • Agricultural waste.
  • Animal by-products (see slaughterhouse waste)
  • Biodegradable waste.
  • Biomedical waste.
  • Bulky waste.
  • Business waste.
  • Chemical waste.

Top Articles
The ugly truth about the 401(k) retirement savings plan
Who is more financially savvy, the younger or older generation? - joleisa
Omega Pizza-Roast Beef -Seafood Middleton Menu
Radikale Landküche am Landgut Schönwalde
Minooka Channahon Patch
Lamb Funeral Home Obituaries Columbus Ga
Fusion
Hay day: Top 6 tips, tricks, and cheats to save cash and grow your farm fast!
Free Robux Without Downloading Apps
When Is the Best Time To Buy an RV?
2021 Tesla Model 3 Standard Range Pl electric for sale - Portland, OR - craigslist
Catsweb Tx State
4Chan Louisville
Job Shop Hearthside Schedule
Leader Times Obituaries Liberal Ks
Jenn Pellegrino Photos
Billionaire Ken Griffin Doesn’t Like His Portrayal In GameStop Movie ‘Dumb Money,’ So He’s Throwing A Tantrum: Report
Invert Clipping Mask Illustrator
CDL Rostermania 2023-2024 | News, Rumors & Every Confirmed Roster
St. Petersburg, FL - Bombay. Meet Malia a Pet for Adoption - AdoptaPet.com
Pickswise Review 2024: Is Pickswise a Trusted Tipster?
Panic! At The Disco - Spotify Top Songs
Scout Shop Massapequa
Program Logistics and Property Manager - Baghdad, Iraq
Invitation Homes plans to spend $1 billion buying houses in an already overheated market. Here's its presentation to investors setting out its playbook.
Diakimeko Leaks
Why do rebates take so long to process?
Walmart Near South Lake Tahoe Ca
Encore Atlanta Cheer Competition
Betaalbaar naar The Big Apple: 9 x tips voor New York City
Red8 Data Entry Job
Yugen Manga Jinx Cap 19
Integer Division Matlab
Kirsten Hatfield Crime Junkie
Jesus Revolution Showtimes Near Regal Stonecrest
Astro Seek Asteroid Chart
Missing 2023 Showtimes Near Mjr Southgate
What Happened To Father Anthony Mary Ewtn
Strange World Showtimes Near Atlas Cinemas Great Lakes Stadium 16
Ducky Mcshweeney's Reviews
Stanford Medicine scientists pinpoint COVID-19 virus’s entry and exit ports inside our noses
Merkantilismus – Staatslexikon
The Closest Walmart From My Location
Author's Purpose And Viewpoint In The Dark Game Part 3
Seminary.churchofjesuschrist.org
Man Stuff Idaho
5A Division 1 Playoff Bracket
Fatal Accident In Nashville Tn Today
Avatar: The Way Of Water Showtimes Near Jasper 8 Theatres
Motorcycles for Sale on Craigslist: The Ultimate Guide - First Republic Craigslist
Theater X Orange Heights Florida
211475039
Latest Posts
Article information

Author: Msgr. Benton Quitzon

Last Updated:

Views: 6024

Rating: 4.2 / 5 (43 voted)

Reviews: 90% of readers found this page helpful

Author information

Name: Msgr. Benton Quitzon

Birthday: 2001-08-13

Address: 96487 Kris Cliff, Teresiafurt, WI 95201

Phone: +9418513585781

Job: Senior Designer

Hobby: Calligraphy, Rowing, Vacation, Geocaching, Web surfing, Electronics, Electronics

Introduction: My name is Msgr. Benton Quitzon, I am a comfortable, charming, thankful, happy, adventurous, handsome, precious person who loves writing and wants to share my knowledge and understanding with you.